Languages
Tag

Parametric design

Infranea supports TEC in future-proofing the tunnels of Amsterdam

The City of Amsterdam wants to ensure future-proof management and maintenance of the integral road tunnel system, and has therefore launched the Aanpak Wegtunnels Amsterdam programme. Within this programme, three tunnels and the traffic control centre are being tackled. The municipality has commissioned Tunnel Engineering Consultants (TEC, a permanent partnership of Royal HaskoningDHV and Witteveen+Bos) to support them in this in the coming years. TEC has engaged Infranea as a partner for support in terms of BIM, 3D design and the development of Digital Tunnel Twins.

Infranea supports Yunex Traffic for Stockholm Bypass

In 2018, the Swedish transport authority granted Siemens Mobility a contract for 800 million SEK (75 million euro) for the delivery of communications, control and monitoring technologies for E4 Stockholm Bypass. This new bypass connects the southern and northern parts of the surrounding municipalities in Stockholm in order to alleviate pressure on the main arterial roads, thereby significantly reducing traveller delays. The southern tunnel will be one of the largest road tunnels in the world.

Scheldt Tunnel Oosterweel Link

The Scheldt Tunnel forms the most important element of the Oosterweel Link and will complete the Antwerp Ring Road on the northern side. The tunnel has a total length of 1,800m and will be constructed in line with the “immersed tunnel” method. In order to do so, 8 tunnel elements of around 60,000 tons each will be constructed in the Rear Port of Zeebrugge and then floated via the North Sea and the Western Scheldt to Antwerp. There, they will be immersed one after another in a previously dredged trench in the Scheldt.

Yes, please contact me

Close the form